Mount Laurel Calendar

Date:

Share post:

Wednesday, Feb 26

Preschool Storytime: Ages 3 to 5 years. 10:30 to 11 a.m. at the Mount Laurel Library. Join in for stories, song, and rhymes with a new theme explored every week. This story time helps kids build early literacy skills and a love of reading. Registration is required at www.mtlaurel.lib.nj.us.

- Advertisement -

Knit and Crochet Meetup: Ages 18 years and up. 1 to 3 p.m. at the Mount Laurel Library. Like to knit or crotchet? Join this friendly group. Beginners to experts are welcome to attend. Participants must bring their own materials. No registration required.

Tai Chi for Health: Ages 18 years and up. 4 to 5 p.m. at the Mount Laurel Library. Certified instructor Bob Stanton teaches tai chi, a gentle exercise that can improve muscle tone, flexibility, and coordination. This class can be done seated or standing. Registration is required at www.mtlaurel.lib.nj.us.

ESL Conversation Class with NJ Literacy: Ages 18 years and up. 6 to 8 p.m. at the Mount Laurel Library. This ESL class is for upper level beginner to lower level intermediate learners. Visit www.literacynj.org/burlington-student-application to apply. Applicants will be contacted and placed in an appropriate class for their learning level.

Friday, Feb. 28

La Hora del Cuento en Español: Ages 2 to 5 years. 10:30 to 11 a.m. at the Mount Laurel Library. Join the library to enjoy Spanish Storytime and learn through the imitation of songs, verses, and games while the class immerses in a new culture and language. This program will contribute to the integral development of children, cultivating the growth of imagination and meaningful exploration. 

Knit & Crochet Afternoon Meetup: Ages 18 years and up. 1 to 3 p.m. at the Mount Laurel Library. Like to knit or crotchet? Join this friendly group. Beginners to experts are welcome to attend. Participants must bring their own materials. No registration required.

Monday, March 3

Move and Groove: Ages 18 months to 5 years. 10:30 to 11 a.m. at the Mount Laurel Library. Join in for this weekly outdoor event where participants will be able to celebrate music through rhymes, songs, and dance-alongs. This program will give kids a chance to learn new dance moves and get active. No registration required.

Knit & Crochet Evening Meetup: Ages 18 years and up. 6:30 to 8:30 p.m. at the Mount Laurel Library. Like to knit or crotchet? Join this friendly group. Beginners to experts are welcome to attend. Participants must bring their own materials. No registration required.

Tuesday, March 4

Toddler Storytime: Ages 18 months to 3 years. 10:30 to 11:00 a.m. at the Mount Laurel Library. Residents are invited for stories, songs, rhymes, and a take-home craft or coloring page as a new theme is explored every week. This story time will help kids build early literacy skills and a love of reading. No registration required. Check the library’s events calendar for updates.

Mahjong: Ages 18 years and up. 1 to 4 p.m. at the Mount Laurel Library. Mahjong is a popular tile-based game of strategy and skill. Some experience is recommended for this event. Participants may bring a National Mahjong League 2023 card and a mahjong set. No registration required.

Current Issue

Moorestown
SideRail

Related articles

Generous teacher Diane Rusk consistently aided students

BY JOE GORMAN Longtime Educator The most generous teacher I ever worked with was Diane Lusk. No child did without...

Super Wawa gets green light

After more than a year of debate over traffic and safety concerns, plans for a new Super Wawa along the border of Voorhees and Berlin townships have reached a major milestone. The Voorhees Township Planning Board reconsidered the proposed development during its Oct. 14 meeting, following a legal dispute that previously stalled the project. The Wawa would be located along northbound Route 73 near Cooper Road, on a property spanning both municipalities. The proposal calls for a 5,915-square-foot convenience store and gas station on approximately 4.95 acres, with 12 fueling positions and 55 parking spaces. The location would operate 24 hours a day and include entrances and exits along Route 73 and Cooper Road.  The development has faced opposition from residents concerned about increased congestion and traffic safety, particularly along Cooper Road, where vehicles already experience delays during busy travel periods. Those concerns contributed to the Voorhees Planning Board's earlier rejection of the application in 2025. Developer NIKI-J&J Voorhees Cooper Partners LLC subsequently filed a lawsuit in Camden County Superior Court, arguing that the board's decision was not supported by the traffic evidence presented during the hearings. The legal challenge eventually led to a settlement requiring the developer to revise its plans to address traffic concerns and return to the planning board for reconsideration.  Under the revised proposal, improvements include extending the left-turn stacking lane on Cooper Road to accommodate additional vehicles and reduce potential backups. The plans also call for updated landscaping, preservation of existing trees and stormwater-management improvements intended to address runoff and groundwater recharge. The changes were designed to address some of the concerns raised during the earlier review process while allowing the development to proceed.  The project had already received approval from the Berlin Township Planning and Zoning Board on Aug. 18. Because the property crosses municipal boundaries, approvals from both municipalities were necessary. Most of the proposed convenience store and fueling stations would be located on the Berlin Township portion of the property, while the Voorhees portion includes access to Cooper Road. Berlin Township Mayor Rick Miller previously expressed support for the project, describing the proposed development as an improvement to the existing property. "Welcome to the Berlin Township business family, Wawa," Miller said following the August approval. "We're looking forward to seeing this project move forward and the positive impact it will have for our residents."  The proposal would redevelop property along the busy Route 73 corridor, where existing uses include a small commercial center and a residential property. The new Wawa would replace those structures with a larger convenience store and fueling facility.  Despite the proposed improvements, traffic remains a central concern for nearby residents, particularly those living along Forrest Hills Drive. During the original September 2025 hearing, resident Harry Garabedian described existing congestion on Cooper Road, warning that the development could add to an already difficult traffic situation. Other residents questioned whether drivers might use the Wawa property as a shortcut between Cooper Road and Route 73, potentially creating additional safety concerns.  The project illustrates the challenges municipalities face in balancing commercial development with traffic conditions and neighborhood concerns. Although the revised plans have advanced through the approval process, a construction timeline and anticipated opening date have not been announced. For residents and commuters traveling along Route 73, the proposed Wawa represents another potential addition to the area's commercial landscape, while questions about its effect on local traffic remain an important part of the discussion.

Meet the Candidates

On Tuesday, Nov. 3, Harrison Twp. residents will go to the polls to vote for several candidates for...

Shaun Dowdy, 18, passes away unexpectedly

Sadness permeated the towns of Palmyra and Riverton on October 10 as residents learned the news about the...