Main Street surveying on tap

Date:

Share post:

Moorestown is moving into the next phase of infrastructure improvements along Main Street. As a result, the township engineer (Pennoni) will conduct surveying for four weeks along the street. The work area extends along Main from Church Street to Chester Avenue, and continues down Chester Avenue to Bridgeboro Road.

The improvements include an underground utility survey, during which Pennoni’s team will mark out all utility lines with bright pink paint. Residents are advised that the mark-outs may extend beyond the street and include the right of way. Surveying marks may potentially extend onto sidewalks and lawns, but all paint is temporary and will fade.

- Advertisement -

To limit interference, surveying will take place sporadically during the day and evening. Pennoni’s surveyors will walk around with equipment for three weeks to create a digital map of Main Street’s existing conditions. Surveying is a necessary precursor to the replacement of the water main and the paving of the street.

The work along Main Street is more involved than typical paving because of a 100-year-old concrete water main and trolley tracks beneath the road. In addition, shallow trolley tracks that have contributed to the road’s premature aging will also be removed.

Moorestown
SideRail

Related articles

Food Choices

Locally grown fresh produce offers the best of all worlds. By Jo Valenti, BSN, RN, Cumberland County Mental...

‘One small piece cancer doesn’t get to rip away’

Ashley Rosser was 40 years old when she was diagnosed with breast cancer. Like many people diagnosed with cancer,...

RCSJ Celebrates Inauguration of Second President

Dr. Brenden Rickards, center, the second president of Rowan College of South Jersey, poses with former President Dr....

Bridgeton School District Wins Cream of the Crop Award

The New Jersey Department of Agriculture recently presented Bridgeton School District with the Cream of the Crop Award...